Mounting the boiler and making connections
Making the connections on the water side
A Heating flow G¾
B DHW G½
1. Mount fittings with gaskets.
A
B
C
¨
C Cold water G½
D Heating return G¾
2. Install filling equipment on site.
Installation sequence
(cont.)
D
The filling equipment must meet Fit-
tings Directive G24.2a.
13