4.8.3 Installation

Wiring of the site monitor is entirely dependent on the signals to be monitored. shows the
basic wiring diagram of a system using a site monitor and a Battery Cell Monitor. Signals
such as site security (windows and doors being opened) are usually connected as digital
inputs, while fuel levels, inverter voltage/current/frequency are measured using the analog
inputs.

4.8.4 System Set-up

The set up of the site monitor including labels of inputs, scale factors, alarm levels,
designation of relays to operate and the type of digital input source (normally open or
normally closed) can only be done using a PC running WinCSU-2. See WinCSU-2 operation
manual for details.
Once programmed, monitoring of the levels and minor modification of levels and scaling on
site can be done from the front panel of the MiniCSU (see Operation section of this manual),
but primarily, the site monitor is designed to be used from WinCSU-2.