Sharp VL-SW50U Service Manual page 38

Liquid crystal camcorder 8 ntsc
Table of Contents

Advertisement

i/L-SWSOU
(12) Install in the following
order: T guide lever spring, T guide lever, pinch lever.
(13) Install the swing arm.
(14) Install the right guide holder.
Item
A S tight Ml .4 x 2.5
Tightening
torque
Quantity
70 mN*m
1
B CW 00.8-03.0-to.2
r
70 mN*m
.
1
Pinch lever
&jad
/
Attach to hook
Take care of position.
Pinch lever
The pinch lever
is positioned on
the stopper.
@B
Secure on back side
Swing arm
Take care not to bend the tension band
during assembly or disassembly.
5-24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents