Cooling Flow - MK Diamond Products MK-660 Owner's Manual & Operating Instructions

Mk diamond products mk-660 tile saw
Table of Contents

Advertisement

MK-660 tile saw

COOliNG FlOw

(A)
Check Flow Adjusting
Clamp is open. If flow exists,
go to Step B
(D)
Remove the Transfer Tube
and check flow. If flow exists,
go to Step F
(G)
Remove the Blade Guard
Intake Fitting, go to Step H.
NOte:
"Rodding" coolant channels is performed by inserting a small wire rod through
the inlet on top of the Blade Guard and directing the rod out through each of the
flow tubes located on the underside of the Blade Guard. The channels should
be "rodded" until all ports are free of foreign debris.
(B)
Remove the Transfer Tube
from the Blade Guard inlet,
go to Step C
(E)
Remove the Pump Discharge
Fitting and check flow. If flow
exists, go to Step F.
(H)
Clean the Blade Guard
Intake Fitting, go to Step I.
35
tROUBlesHOOtiNG
(C)
Place Pump into a bucket of
water and check flow. If flow
exists, go to Step D
Intake Screen
(F)
Remove the Pump Intake
Screen and check for debris.
If flow exists, go to Step G.
(I)
Rod Cooling Channels and
recheck flow

Advertisement

Table of Contents
loading

Table of Contents