Installation - Sharp MX-M623N Installation Manual

Digital multifunctional system
Hide thumbs Also See for MX-M623N:
Table of Contents

Advertisement

C. Check the packed items
1)
Check that all the items are included in the package.
1
4
1
Positioning pin
1 pc.
2
Earth plate
1 pc.
3
Earth mounting plate
1 pc.
4
Rail mounting plate
1 pc.
5
Staple label
2 pcs.
2.

Installation

<Note before installation>
* Before starting installation, check to insure that the data lamp on
the operation panel does not light up or blink.
A. Turn off the power of the main unit
1)
Turn OFF the power switch on the operation panel.
2)
Open the front cabinet.
Turn OFF the power switch in the front cabinet of the main unit.
3)
Disconnect the power plug of the main unit from the power out-
let.
2
3
5
6
7
9
8
6
Screw G (M4 x 8)
3 pcs.
7
Screw H (M4 x 14)
2 pcs.
8
Screw I (M4 x 18)
4 pcs.
9
Punch position label
2pcs.
OFF
MX-M753N MX-FN15/FN16 5 – 4
B. Attach the positioning pin and the earth plate
to the main unit
1)
Attach the positioning pin with two fixing screws I to the left
upper section of the main unit. Be careful to the attachment
direction of the positioning pin.
2)
Attach the earth plate with the fixing screws H (2 pcs.) to the
left lower section of the main unit.
In this case, attach so that the R mark on the earth plate faces
up.
R
3)
Pull out the lock release lever on the left side of the main unit,
and open the left door.
2
4)
Remove the paper exit cover on the upper side of the left door.
5)
Close the left door.
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx-m623uMx-m753nMx-m753u

Table of Contents