2-3.
CHECK AND ADJUSTMENT
• When the parts of the tape path (tape guide and reel table, etc.)
have been removed or parts have been replaced, adjust the
following parts and according to the flowchart below.
• ADJUSTMENT POSITION
TG3
(Tape path entrance, curl)
TG1 spring hook
(FWD back tension)
TG1 (Arm)
(FWD position)
• ADJUSTMENT ORDER (Flowchart)
ADJUSTMENT
START-1
(Refer to next page.)
ADJUSTMENT
START-2
(Refer to page 6-54.)
Drum
Reel table (S) torque
2-3-1. FWD POSITION CHECKING AND ADJUSTMENT
2-3-2. FWD BACK TENSION CHECKING AND ADJUSTMENT
2-3-3. REEL TABLE (S) / REEL TABLE (T) TORQUE CHECK
2-3-4. PREPARATION FOR
TAPE PATH CHECKING AND ADJUSTMENT
2-3-5. TRACK CHECKING AND ADJUSTMENT
2-3-6. TG7 SLACK CHECKING AND ADJUSTMENT
2-3-7. CURL CHECKING AND ADJUSTMENT
2-3-8. CUE / REV CHECK
2-3-9. RISING CHECK
DSR-PD170/PD170P/PD190P
Reel table (T) torque
E N D
6-51
TG6
(Tape path exit, curl)
TG7
(Tape path slack, curl)