Outer Case - Potterton Promax 15 HE Installation & Service Instructions Manual

Table of Contents

Advertisement

11.0 OUTER CASE

11.1
Fitting The Outer Case
1. Position the outercase over the boiler engaging
the lugs in the side flanges over the hooks on the
wall plate (Fig. 37).
2. Carefully centralise the On/Off switch through the
cut-out on the facia. Using the screw supplied in the
kit, secure the outercase from the bottom (Fig. 37).
3. Carefully read and complete all sections of the
"Benchmark" Installation, Commissioning and
Service Record Log Book that are relevant to the
appliance and installation. The details of the Log
Book will be required in the event of any warranty
work. The Log Book must be handed to the user for
safe keeping and each subsequent regular service
visit recorded.
For IE, it is necessary to complete a "Declaration of
Conformity" to indicate compliance to I.S. 813. An
example of this is given in I.S. 813 "Domestic Gas
Installations". This is in addition to the "Benchmark"
Log Book.
4. Instruct the user in the operation of the boiler
Fig. 37
controls. Hand over the User's Operating,
Installation and Servicing Instructions and the Log
Book, giving advice on the necessity of regular
servicing.
5. Advise the user that a plume of vapour from the
flue terminal is normal, and that there is no need for
concern.
6. Complete the label supplied with the inhibitor and
stick to the inside of the boiler case. Detail of system
treatment must be recorded in the Benchmark Log
Book.
Fig. 38
28
Publication No. 5106451

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Promax 24 he

Table of Contents