13.0

Fitting the Outer Case

13.1
Fitting The Outer Case
Break Off Panel
1. Position the outercase over the boiler engaging the
lugs in the side flanges over the hooks on the wall plate.
Break off top or bottom panel as required to
accommodate pipework runs (Fig.37).
2. Using the two screws supplied in the kit, secure the
outercase to the combustion box (Fig. 37).
3. Replace the lower door panel (Fig. 38).
4. The "Important Ventilation Information" label can be
removed unless the appliance is installed in an
unventilated compartment.
5. Carefully read and complete all sections of the
Benchmark Commissioning Checklist at the rear of this
publication that are relevant to the appliance and
installation. These details will be required in the event of
any warranty work. The publication must be handed to
the user for safe keeping and each subsequent regular
Fig. 37
service visit recorded.
For IE, it is necessary to complete a "Declaration of
Outercase Securing
Conformity" to indicate compliance to I.S. 813. An
Screws
example of this is given in I.S. 813 "Domestic Gas
Installations". This is in addition to the Benchmark
Commissioning Checklist.
6. Instruct the user in the operation of the boiler
controls. Hand over the User's Operating, Installation
and Servicing Instructions, giving advice on the necessity
of regular servicing.
7. Demonstrate to the user the action required if a gas
leak occurs or is suspected. Show them how to turn off
the gas supply at the meter control, and advise them
not to operate electric light or power switched, and to
ventilate the property.
8. Show the user the location of the system control
isolation switch, and demonstrate its operation.
9. Advise the user that they may observe a plume of
vapour from the flue terminal, and that it is part of the
normal operation of the boiler.
10. Complete the label supplied with the inhibitor and
stick to the inside of the boiler case. Detail of system
Fig. 38
Lower Door Panel
treatment must be recorded in the Benchmark
Commissioning Checklist.
38
© Baxi Heating UK Ltd 2007

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Promax 15 slPromax 18 slPromax 30 slPromax 24 sl

Table of Contents