Fig. 23
20
Outercase
8.0
INSTALLATION
8.2
Preparing The Boiler
1. Remove the outer carton.
2. Remove the internal packaging.
3. Lift the outercase upwards and remove
(Fig. 23).
Potterton declare that no substances harmful
to health are contained in the appliance or
used during appliance manufacture.
Publication No. 5106451