Baxi Solo 12 HE Installation And Servicing Instructions page 46

Wall mounted powered flue condensing boilers gas fired central heating units
Table of Contents

Advertisement

Combustion Box
Door Panel
Burner
Fig. 56
Securing Screws
Heat Exchanger
Assembly
46
© Baxi Heating UK Ltd 2006
Fig. 55
Switch
Fig. 58
Heat Exchanger
Manifold
Fig. 59
The burner and heat exchanger can be changed after
removal of the combustion box door. To change the
heat exchanger, the fan and burner must be removed
first (see section 15.6 and 15.10).
1. Remove the combustion box door by removing the
four securing screws (Fig. 55).
15.10
1. Remove the two screws securing the burner to the
Support
base of the combustion box.
Bracket
Return
Connection
2. Remove the burner carefully from the combustion
box base.
Fig. 57
3. Check the burner seal on the heat exchanger base,
replace if necessary. Fit the new burner and reassemble
in reverse order.
15.11
1. Drain the boiler (see section 15.1 paragraph 2 & 3).
Flow
2. Remove all components in the base of the airbox.
3. Undo the screws on the support bracket. Remove
the screws securing the flow switch and return
connections and remove the connections (Fig. 57).
4. Remove the screws securing the heat exchanger
manifold and remove the manifold (Fig. 58).
5. Lift the heat exchanger assembly (Fig. 59) and rotate
the bottom upwards whilst pulling it forwards out of the
airbox.
6. Fit the new heat exchanger and reassemble in reverse
order.
7. Recommission the boiler and check the inhibitor
concentration (see Section 6.2 and 12.1).
15.0
Changing Components
IMPORTANT: On refitting the combustion box
door check the condition of the combustion box
door seals.
Burner
(Fig. 56)
Heat Exchanger

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solo 18 heSolo 15 heSolo 24 heSolo 30 he

Table of Contents