Baxi Solo 12 HE Installation And Servicing Instructions page 42

Wall mounted powered flue condensing boilers gas fired central heating units
Table of Contents

Advertisement

Support Bracket
Flow Switch
Clip
42
© Baxi Heating UK Ltd 2006
Flow Pipe
Fig. 47
15.0
Changing Components
15.3
Flowswitch
(Fig. 47)
1. Drain the boiler (see Section 15.1 paragraph 2 & 3).
2. Remove the two screws on the support bracket.
3. Remove the clip securing the flow pipe to the
flowswitch.
4. Disconnect the inline electrical connection.
5. Pull pipe away from flowswitch.
6. Remove the two screws securing the flowswitch to
the boiler.
7. Remove the flowswitch.
8. Fit the new flowswitch and reassemble in reverse
order.
9. Recommission the boiler and check the inhibitor
concentration (see Section 6.2 and 12.1).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solo 18 heSolo 15 heSolo 24 heSolo 30 he

Table of Contents