Baxi Solo 12 HE Installation And Servicing Instructions page 43

Wall mounted powered flue condensing boilers gas fired central heating units
Table of Contents

Advertisement

Control
Knob
Plastic
Button
Cover
Fig. 48
Hinge down
PCB Housing
Blue (CN11) Jumper
Red (CN12) Jumper
© Baxi Heating UK Ltd 2006
PCB Housing Securing
Screw
Fig. 49
15.0
Changing Components
15.4
PCB
(Figs. 48 & 49)
WARNING: The PCB Control and Fan
Assembly are 325 Vdc. Isolate at supply
before access.
1. Pull the control knob off the spindle and remove the
plastic button cover. Refit them onto the new PCB
(Fig. 48).
1. Remove the top right hand securing screw and hinge
down the PCB housing and disconnect the electrical
connections noting their positions
NOTE: Check the PCB for the presence of input
jumpers - see section 10.8. Set the new PCB as the
one removed.
2. Lift Control PCB housing out of hinge housing of
metal bracket.
3. Fit the new PCB Housing Assembly and reassemble
in reverse order.
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solo 18 heSolo 15 heSolo 24 heSolo 30 he

Table of Contents