Heat & Glo SL-550TR-E Owner's Manual page 27

Hide thumbs Also See for SL-550TR-E:
Table of Contents

Advertisement

V
Minimum
1
SL-550TR-E
90 Elbow **
2 ft.
610 mm
1/2 ft.**
152 mm
6 ft.
1.8 m
1-1/2 ft.** 457 mm 10 ft.
3.0 m
2-1/2 ft.** 762 mm 12 ft.
3.7 m
3-1/2 ft.
1.1 m
14 ft.
4.3 m
V
*No specifi c restrictions on this value EXCEPT V
Fire Risk.
• When using SLP-HRC-SS and SLP-HRC-ZC-
SS termination caps on top vented fi replaces,
a one foot minimum vertical vent section is
required before installing fi rst elbow.
• When using DVP-TB1 termination cap on top vented
fi replaces, a three foot minimum vertical vent section is
required before installing fi rst elbow.
Figure 7.6
Top Vent - Horizontal Termination
Venting with three 90º elbows
H
+ H
Maximum
1
2
SL-750TR-E
SL-950TR-E
2 ft.
610 mm
2 ft.
6 ft.
1.8 m
6 ft.
10 ft.
3.0 m
10 ft.
12 ft.
3.7 m
12 ft.
14 ft.
4.3 m
14 ft.
H
+ H
MAX. =14 ft. (4.6 m)
1
2
+ V
+ H
+ H
MAX. = 40 ft. (12.2 m)
1
2
1
2
+ V
+ H cannot exceed 40 ft. (12.2 m)
1
2
** See warning below
H
2
WARNING **
Heat & Glo • SL-550 / 750 / 950TR-E • 2118-900 Rev. AC • 3/15
V
V
+ V
Min.
2
1
2
610 mm
*
*
1.8 m
*
*
3.0 m
*
*
3.7 m
*
*
4.3 m
*
*
V
2
H
Note: Use SLP Series
components only.
Note: There MUST be a 25%
reduction in total H when using
fl ex vent except when using the
simple up and out installation
(see Figure 7.3).
1
V
1
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents