52
53
14
13
14
51
Upper Pulley
13
Lower Pulley
49
44
44
48
STEP 6:
Uncoil the cables to remove all twists.
Remove the (UPPER) PULLEYS (13) on the RIGHT TOWER (11) and LEFT TOWER (1) by removing the M10 x
50mm SCREW (52), PULLEY RETAINER (53), M10 SOCKET HEAD NUT (51), and PARTIAL PULLEY COVERS
(14). Set the (UPPER) PULLEYS (13) and hardware aside.
Remove the (LOWER) PULLEYS (13) on the RIGHT TOWER (11) and LEFT TOWER (1) by removing the M10 x
45mm SCREW (48), two M10 WASHERS (44), and M10 HEX NYLOCK NUT (49).
15