Bmr Specific Installation Steps - Bellfires BM 21 Installation Manual

Table of Contents

Advertisement

Bellfires® BM & BR
BR specific directions
Install refractory dome on
top of firebox aligning
inside back walls flush on
both units. (Fig 9). Make
sure the CREA-FOIL
pieces are 1" larger than
the outside walls of the
masonry dome, so you
can overlap the corners.
(Fig. 10).
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bm 25Bm 28Bm 21rBm 25rBm 28r

Table of Contents