Servicing - Baxi Platinum Combi 24 HE Installation & Servicing Instructions Manual

Gas fired wall mounted condensing combination boiler
Table of Contents

Advertisement

Case Front Panel
Fig. 40
Facia Panel Securing
Screws
Inner Door
Panel
32
Fig. 41
Condensate
Trap
Fig. 41a

11.0 Servicing

11 .1
Annual Servicing
1. For reasons of safety and economy, it is recommended that
the boiler is serviced annually.
Servicing must be performed by a competent person.
If a combustion analyser is available the CO
checked and adjusted - see Section 13.0.
2. After servicing, complete the relevant Service Interval
Record section of the Benchmark Commissioning Checklist at
the rear of this publication.
3. Ensure that the boiler is cool.
4. Ensure that both the gas and electrical supplies to the
boiler are isolated.
5. Slacken the screws securing the facia panel. Lift the
outercase panel so that its securing tabs are clear of the facia.
Remove the panel, allowing the facia to hinge down (Fig. 40).
6. Remove the screws securing the inner door panel. Lift the
panel slightly to disengage it from the studs on top of the case
(Fig. 41).
7. Unscrew the sump from the bottom of the condensate trap
assembly (Fig. 41a).
8. Remove any deposits from the sump and trap. Clean as
necessary and replace the sump.
Sump
can be
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Platinum combi 28 hePlatinum combi 33 he

Table of Contents