10 Maintenance
Fig.68
Resetting the upcoming message
F1 F1 F1
F2 F3 F4
10.3
Standard inspection and maintenance operations
10.2.3

Resetting the upcoming maintenance message

Reset an upcoming maintenance message once the intermediate
maintenance service has been carried out.
1. Navigate to the Counter menu.
2. Press the F4 key to open the menu.
3. Turn the
knob until the code SVC is displayed.
4. Press the F4 key to access the maintenance message.
5. Turn the
knob until the code 0012 is displayed.
6. Press the F4 key to confirm..
7. Turn the
knob until the code CLR is displayed.
8. Press the F4 key for around 3 seconds, to confirm and reset the
maintenance message.
The display shows DONE. The maintenance message is reset.
9. Press the F1 key several times to return to the main screen.
10.3.1

Annual Servicing

Warning
Ensure that the boiler is cool. Ensure that both the gas and electri­
cal supplies to the boiler are isolated.
Caution
Always examine any seals or gaskets, replacing where necessary.
Where a seal or gasket is supplied with a spare part it should be
used, irrespective of the condition of the original. Use only original
spare parts that are intended for use with this type of boiler.
Important
When performing any inspection or maintenance, personal protec­
tive equipment must be used where appropriate.
1. Ensure that both the gas and electrical supplies to the boiler are iso­
lated and that the boiler is cool.
2. Remove the case front panel and hinge down the control panel.
3. Carefully examine all seals and gaskets, replacing if necessary. Look
for any evidence of leaks or corrosion and if found determine and
rectify the cause.
4. Complete the relevant Service Interval Record section of the Bench­
mark Commissioning Checklist at the rear of this publication and
then hand it back to the user.
10.3.2

Checking the water pressure

In order for the boiler to operate correctly, the pressure of the water in the
heating circuit, shown on the display, must be between 1.0 and 1.5 bar.
If necessary, restore the water pressure as described in the chapter
entitled "Filling the installation".
10.3.2

Checking the expansion vessel

Check the expansion vessel and replace it if necessary. Check its
pre-charge every year and restore the pressure to 1 bar if necessary.
800 System 2