Before Installation, Reinstallation Or Troubleshooting; Before Start-Up; During Operation; Misc - Linak DL12 User Manual

Hide thumbs Also See for DL12:
Table of Contents

Advertisement

Before installation, reinstallation, or troubleshooting
• Stop the DB/DL.
• Switch off the power supply and pull out the mains plug.
• Relieve the DB/DL of any loads, which may be released during the work.

Before start-up:

• Make sure that the system has been installed as instructed in this User
Manual.
• Make sure that the voltage at the control box is correct before the
system is connected to the mains.
• System connection. The individual parts must be connected before the
control box is connected to the mains. See the User Manual for LINAK
actuators, if necessary.

During operation:

• If the control box makes unusual noises or smells, switch off the mains
voltage immediately.
• Take care that the cables are not damaged.
• Unplug the mains cable on mobile equipment before it is moved.

Misc.

The actuator system has a sound level below 55dB(A) in typical
applications.
Updated manuals and declarations can always be found here:
www.linak.com/deskline
Page 6 of 36

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DL12 and is the answer not in the manual?

This manual is also suitable for:

Db12Dl17 systemwith cbd4Cbd5Cbd6Dl14Db14

Table of Contents