22
4. Position the Access Point bracket section so the bottom of the section with the straight (not bevel cut) side
is oriented toward the bottom side of the AP with the gore vent. Using a torque wrench or a ratchet and
a 10mm socket, or an adjustable wrench, attach (but don't tighten) the Access Point bracket section to the
AP-8163 with the four M6 flange screw.
5. Insert two M6 hex flange screws into the bottom holes on the sides of the Access Point bracket section.
AP-8163 Access Point