Chapter 2 Preparing For Installation; Package Contents; Safety Precautions - TP-Link T3700G-28TQ Installation Manual

Jetstream stackable l3 managed switch
Hide thumbs Also See for T3700G-28TQ:
Table of Contents

Advertisement

Stackable L3 Managed Switch
ChaCter 1
11C

Package Contents

111

Safety Precautions

05
Preparing For Installation
PreCaring For Installation
Make sure that the package contains the following items. If any of the listed items is
damaged or missing, please contact your distributor.
One Switch
One Resource CD
To avoid any device damage and bodily injury caused by improper use, please observe
the following rules.
Safety Precautions
Keep the power off during the installation.
Wear an ESD-preventive wrist strap, and make sure that the wrist strap has a good
skin contact and is well grounded.
Use only the power cord provided with the switch.
Make sure that the supply voltage matches the specifications indicated on the rear
panel of the switch.
Ensure the vent hole is well ventilated and unblocked.
Do not open or remove the cover of the switch.
Before cleaning the device, cut off the power supply. Do not clean it by the waterish
cloth, and never use any other liquid cleaning method.
Site Requirements
To ensure normal operation and long service life of the device, please install it in an
environment that meets the requirements described in the following subsection.
Temperature/Humidity
O n e Po w e r C o rd a n d o n e
This Installation Guide
Console Cable
One PSM150-AC
Two mounting brackets and
the fittings

Advertisement

Table of Contents
loading

Table of Contents