3. Choose either the cooling operation or the heating operation.
○
Choose SW
5 or
○
Choose
5 for the cooling operation, and choose
By choosing
By choosing
11.17.4 CHECK AFTER COMPLETING INSTALLATION
Check the signals to make sure the each setting switch operates properly.
○
Be sure that choosing
○
6 .
○
5 , the wired controller indicates priority to the cooling operation.
○
6 , the wired controller indicates priority to the heating operation.
2 to enable cooling/heating selector.
○
6 for the heating operation.
208