EAS00188
ENGINE REMOVAL
EXHAUST PIPES AND MUFFLERS
20 Nm (2.0 m
kg, 14 ft
•
4
27 Nm (2.7 m
kg, 19 ft
•
20 Nm (2.0 m
kg, 14 ft
•
23 Nm (2.3 m
20 Nm (2.0 m
Order
Removing the exhaust pipes and
mufflers
1
O
sensor coupler
2
2
O
sensor
2
3
Muffler (left and right)
4
Exhaust pipe (left and right)
5
Gasket
6
Exhaust pipe bracket
Ib)
•
5
New
LS
New
5
Ib)
•
Ib)
•
kg, 17 ft
Ib)
•
•
kg, 14 ft
Ib)
•
•
12 Nm (1.2 m
Job/Part
ENGINE REMOVAL
ENGINE
27 Nm (2.7 m
45 Nm (4.5 m
3
1
2
LT
LT
6
kg, 8.7 ft
Ib)
•
•
Q'ty
Remove the parts in the order listed.
1
Disconnect.
1
2
2
5
1
For installation, reverse the removal pro-
cedure.
– 41 –
ENG
kg, 19 ft
Ib)
•
•
kg, 32 ft
Ib)
•
•
10 Nm (1.0 m
•
27 Nm (2.7 m
LS
5
New
27 Nm (2.7 m
LT
LT
4
20 Nm (2.0 m
Remarks
kg, 7.2 ft
Ib)
•
kg, 19 ft
Ib)
•
•
3
kg, 19 ft
Ib)
•
•
kg, 14 ft
Ib)
•
•