(1000 l/h) in accordance with these operating and installation instructions. Pressure drop - heat exchanger (1500 l/h) The manufacturer’s warranty only applies, kW - Heating capacity - heat exchanger 13.7 if the WWK 300 is installed, connected and at flow temp. 55 °C operated in accordance with these operating (flow rate: 1000 l/h) and installation instructions. Water con. heat ex. (male thread) Ø (outside) In conjunction with the positioning/ installation, observe all local/national Test point at 35 °C air temperature, 70 % rel. humidity and 55 °C water temperature. Average value at 15 °C air temperature, 70 % rel. humidity, and heating water from 15 °C to 55 °C.
Operating instructions for users and contractors 1 Operation and control 1.4 Description of functions 1.5 Operation outside the limits of use below 1.4.1 Heat pump operation 6 °C to 4 °C The WWK 300 domestic hot water (DHW) heat This is the standard operating mode, to which Subject to the relative humidity and the pump from STIEBEL ELTRON is an automatic the limits of scope of the heat pump apply DHW temperature inside the cylinder, the DHW heater offering a capacity of approx. 300 (see: specification). To heat the cylinder evaporator begins to ice up below a room l. The required DHW temperature can be pre- content of approx. 300 litres of water to 55 °C, temperature of 6 °C. When the evaporator selected. the WWK 300 (to EN 55 part 3) requires: is covered in hoarfrost, the frost stat N (see Your local contractor will install, connect and wiring diagram) shuts down the compressor, commission your WWK. Nevertheless, you whilst the fan continues to operate, thereby ϑ ϑ τ should familiarise yourself with the most COP(t) Space Cold water Heat-up defrosting the compressor. The compressor important aspects of this equipment. 6 °C 70 % 15 °C 11.5 h...
1 (S1) °C >60°C 4 (S5) 2 (S2 / H1) Description in brackets, see wiring diagram Fig. 8, page 8 Fig. 1 Function Main ON/OFF Push button (2) Clock (4) programmed WWK 300 / WWK 300 SOL switch (1) Only heat pump operation 5 °C to 55 °C. – – Single reheating via the electrical heater rod to 65 °C. – Programmed start of the electrical heater rod via the time switch. – 1.7.2 Description of functions segments. The shortest switching period is is overloaded due to excessive ambient – Switch (1) switches the entire heat pump...
Installation instructions for contractors 2 Safety equipment and excessively, either the valve seat has become When replacing the front facia en- contaminated, the water pressure is too high maintenance sure that the earth cable is correctly or the pressure reducing valve has become connected. 2.1 On the equipment faulty. In case of a fault, the safety equipment of the Cleaning the evaporator WWK 300 interrupts the relevant power circuit. Pressure reducing valve (on-site provision) Maintaining the full output of the WWK 300 Check the valve for perfect function. Replace requires an occasional professional cleaning of Such faults can, for example, be it, if necessary.
3 Installation The available floor area in the installation Positioning room must be at least 6 m². Never install 3.1 Transport this equipment in rooms with a volume of To protect the equipment against damage, less than 13 m³. it must be transported vertically inside Never restrict the ambience around the its dedicated packaging. Where space is °C WWK 300 through walls or ceilings closer >60°C restricted, you may also move the equipment than shown in Fig. 4. tipped backwards at an angle. The room temperature must never fall below +6 °C, as the ambient temperature 3.2 Positioning will be reduced by approx. 1-3 °C through Unscrew the four screws from the non- the heat pump operation. The initial returnable pallet. temperature level will be re-established Remove the washers. approx. ½ hour after the heat pump has Before removing the equipment from been switched OFF. the pallet, remove the anti-vibration mounts from the pack supplied with When installing the heat pump in a boiler the equipment, and insert fully into the room, ensure that the boiler will not be equipment. impaired. Remove the equipment from its pallet and position it where required.
The condensate from the WWK 300 is Reheat with boiler channelled to a drain via a hose (½” dia.). Where necessary, install a condensate pump (for part no., see page ). Connecting a circulation line to the cylinder The heat losses incurred in the circulation line and the electrical power consumption of the circulation pump, reduce the efficiency of the system. The cooled down water in the circulation line mixes with the cylinder content. Where possible, avoid installing a circulation line. Where that is not possible, control the circulation pump thermally or by a time switch. 3.4 Boiler connection (WWK 300 SOL) Pipe bends with union nuts are supplied with equipment which has heat exchangers Cold water installed, to enable easy connection to a safety assembly boiler. Such connection is only permitted with boilers providing DHW priority and in conjunction DHW heat pump Solar collector with an electronic temperature sensor DHW cylinder probe Boiler operating with low voltage (capturing the Solar circulation pump Air vent valve cylinder temperature of the heat pump).
Control panel WWK 300 / WWK 300 SOL unit. 3.5 Electrical connection The WWK 300 is supplied fully wired. A 30 V / 50 Hz socket is required. Line fuse rating: 16 A gL. A cable grommet is provided at the back of the heat pump to enable control equipment to be connected (temperature sensor). Before plugging in the mains plug, set switch (1) (Fig. 1) OFF (0). Fill the cylinder with water. Fig. 7 Wiring diagram WWK 300 / WWK 300 SOL E1 Electric heater rod F1 High limit safety cut-out 1/N/PE AC 50Hz 230V...
4 Commissioning 3. Environment and Recycling Your local contractor must implement the commissioning: Fill the cylinder to prevent Recycling of obselete appliances damage to the compressor and radiators. For Appliances with this label must not be filling, open the water valve, until water flows disposed off with the general waste. out. They must be collected separately and dis- posed off according to local regulations. Open the safety valve, until water flows out free of bubbles. Then close the safety valve. – Starting the WWK 300: 4. Guarantee Set switch 1 to ON. – Supplementary heater: Press push button For guarantees please refer to the respecti- ; the indicator lamp inside the push but- ve terms and conditions of supply for your ton lights up country. – Set the temperature selector 3 The installation, electrical connec- Fully clockwise. tion and first operation of this appli- ance should be carried out by a qualified – Set the time at clock 4.