(4) Do a leak test of all joints of the tubing (both indoor and
outdoor) and both gas and liquid service valves. Bubbles
indicate a leak. Wipe off the soap with a clean cloth after a
leak test.
(5) After the system is found to be free of leaks, relieve the
nitrogen pressure by loosening the charge hose connector
at the nitrogen cylinder. When the system pressure is
reduced to normal, disconnect the hose from the cylinder.
Evacuation
(1) Attach the charge hose end described in the preceding
steps to the vacuum pump to evacuate the tubing and
indoor unit. Confirm that the "Lo" knob of the manifold valve
is open. Then, run the vacuum pump. The operation time
for evacuation varies with the tubing length and capacity of
the pump. The following table shows the amount of time for
evacuation:
Required time for evacuation
when 30 gal/h vacuum pump is used
If tubing length is
less than 15 m
45 min. or more
If tubing length is
longer than 15 m
90 min. or more
37
Manifold valve
Pressure
Lo
Hi
gauge
Open
Gas
tube
Open
Liquid
tube
Open
Balance
tube
Vacuum pump
Close
Outdoor unit
Close
Close
Fig. 6-4