LIFTING THE BOILER
Lift the boiler onto its mounting bracket.
FIG. 15
Position boiler on its mounting bracket so that the sides of
the boiler line up with the reference lines 'C' on the rear
wall.
Undo the two screws securing the transportation foot and
discard foot. Vertical alignment with rear wall can be
corrected using the adjustment screws at the rear of the
boiler. See FIGS. 16 & 17.
Fig. 17 SECURING BOILER
Rotate the left hand adjustment screw to align one of the
holes in the base plate with hole 'D' in the wall. Working
through the hole in the leg, secure the base plate to the
wall using the screw from accessory pack 'D'.
Make good the wall surface around the flue terminal. Fit
optional terminal wall plate if required.
Supplied By www.heating spares.co Tel. 0161 620 6677
FIG. 16 TRANSPORTATION FOOT
Locate the studs on the air duct flange through the boiler
casing and secure using four wing nuts (accessory pack
F).
Fig. 18 FLUE ELBOW EXTENSION
When side fluing, slide the elbow extension on to the elbow
and ensure that it is pushed on fully. Engage the screw
from accessory pack 'C' into the pre-drilled hole in the
elbow extension and screw fully home. The screw which is
self drilling will pierce the elbow and secure the extension
to the elbow.
When rear fluing, the elbow extension should be discarded.