Download Print this page

Potterton Profile Installation And Servicing Instructions page 12

100e, fanned balanced flue gas fired boiler

Advertisement

Installation Instructions - Page 12
Fig. 11a SIDE FLUE
1. Measure from outside face of wall to the side of boiler
casing reference line (dimension 'x').
2. Take air/flue duct assembly and measuring from the
flanged end, mark and cut the outer duct and inner flue
duct to dimension 'x' plus 20mm. Ensure that both
ducts are cut squarely.
Fig. 12 AIR/FLUE DUCT ASSEMBLY
1. Slide rope sealing ring on to air duct.
2. Engage the terminal on to the ends of the inner flue
duct and press fully home.
Supplied By www.heating spares.co Tel. 0161 620 6677
Fig. 11b REAR FLUE
1. Measure wall thickness (dimension 'Y').
2. Take air/flue duct assembly and measuring from the
flanged end, mark and cut the outer air duct and inner
flue duct to dimension 'Y', plus 45 mm. Ensure that
both ducts are cut squarely.
NOTE
Cutting length remains the same for minimum or
maximum clearance at the rear of the boiler.
3. Engage four screws from accessory pack 'C' into the
pre-drilled holes in the terminal and screw fully home.
These screws which are self drilling will pierce the air
duct and secure the terminal to air duct.
12

Advertisement

loading