Pcb & Spark Generator - Baxi Genesis 80 Installation And Servicing Instructions

Gas fired wall mounted combination boiler
Table of Contents

Advertisement

Genesis
CHANGING COMPONENTS – Page 32
44 - 45
Supplied By www.heating spares.co Tel. 0161 620 6677
PCB and Spark Generator
Hinge down the electrical box.
Remove the screws and small cover.
Remove the three screws to release the cable clamp.
Unplug the multipin connections to the two P.C.B.s as
follows:-
1. Mains input plug- (C).
2. Pressure switch & fan - (D).
3. Safety thermostat & sensing electrode - (E).
4. Pump - (F).
Unplug the-two spark electrode leads from the generator -
(G).
Remove single screw securing the grounding strip to the
large plastic cover -(H).
Disconnect the earth tag going to the power P.C.B.
Unplug multipin connector (18 wire) from the control P.C.B.
at (A).
Remove the four screws and large cover panel to expose
P.C.B.s.
Baxi Heating Ltd.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Genesis 96

Table of Contents