Panasonic CS-C7CKP Service Manual page 51

Hide thumbs Also See for CS-C7CKP:
Table of Contents

Advertisement

11.1.4. Balance refrigerant of the 2-way, 3-way valves
(Lack of refrigerant in the refrigeration cycle)
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to
the open position.
2. Connect the charge set to the 3-way valve's service
port.
• Leave the valve on the charge set closed.
• Connect the charge hose with the push-pin to the
service port.
3. Connect the charge set's centre hose to refrigerant
reclaiming equipment.
• Purge the air from charge hose.
4. Open the valve (Low side) on the charge set and
discharge the refrigerant until the gauge indicates 0.05
2
MPa (0.5 kg/cm
G) to 0.1 MPa (1 kg/cm
• If there is no air in the refrigeration cycle (the pressure
when the air conditioner is not running is higher than 0.1
2
MPa (1 kg/cm
G), discharge the refrigerant until the
gauge indicates 0.05 MPa (0.5 km/cm
2
kg/cm
G). If this is the case, it will not be necessary to
apply a evacuation.
• Discharge the refrigerant gradually; if it is discharged
too suddenly, the refrigeration
discharged.
5. Turn on refrigerant reclaiming equipment.
CS-C7CKP CU-C7CKP5 / CS-C9CKP CU-C9CKP5 / CS-C9CKP CU-C9CKP6 / CS-C12CKP CU-C12CKP5 / CS-C12CKP CU-C12CKP6
2
G).
2
G) to 0.1 MPa (1
oil will also
be
51

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents