Install The Outdoor Unit; Connecting The Piping - Panasonic CS-C7CKP Service Manual

Hide thumbs Also See for CS-C7CKP:
Table of Contents

Advertisement

HOW TO TAKE OUT FRONT GRILLE
Please follow the steps below to take out front grille if
necessary such as when servicing.
1. Set the vertical airflow direction louver to the horizontal
position.
2. Slide down the two caps on the front grille as shown in the
illustration below, and then remove the two mounting
screws.
3. Pull the lower section of the front grille towards you to
remove the front grille.
When reinstalling the front grille, first set the vertical
airflow direction louver to the horizontal position and
then carry out above steps 2 - 3 in the reverse order.
AUTO SWITCH OPERATION
The below operations will be performed by pressing the
"AUTO" switch.
1. AUTO OPERATION MODE
The Auto operation will be activated immediately once the
Auto Switch is pressed.
2. TEST RUN OPERATION (FOR PUMP DOWN/SERVICING
PURPOSE)
The Test Run operation will be activated if the Auto Switch
is pressed continuously for more than 5 sec. to below 10
sec.. A "pep" sound will occur at the fifth sec., in order to
identify the starting of Test Run operation
3. REMOTE CONTROLLER RECEIVING SOUND ON/OFF
The ON/OFF of Remote Controller receiving sound can be
change over by pressing the "AUTO" Switch continuously
for 10 sec. and above. A "pep", "pep" sound will occur at the
tenth sec., in order to indicate the "ON/OFF" change over of
remote control receiving sound.
CS-C7CKP CU-C7CKP5 / CS-C9CKP CU-C9CKP5 / CS-C9CKP CU-C9CKP6 / CS-C12CKP CU-C12CKP5 / CS-C12CKP CU-C12CKP6
10.3. OUTDOOR UNIT
10.3.1. SELECT THE BEST LOCATION

10.3.2. INSTALL THE OUTDOOR UNIT

10.3.3. CONNECTING THE PIPING

Connecting The Piping To Indoor Unit
Please make flare after inserting flare nut (locate at joint portion
of tube assembly) onto the copper pipe. (In case of using long
piping)
Connect the piping
Connecting The Piping To Outdoor Unit
Decide piping length and then cut by using pipe cutter. Remove
burrs from cut edge. Make flare after inserting the flare nut
(located at valve) onto the copper pipe.
Align center of piping to valves and then tighten with torque
wrench to the specified torque as stated in the table.
43
(Refer to "Select the best location"
section)
• After selecting the best location, start installation according
to Indoor/Outdoor Unit Installation Diagram.
1. Fix the unit on concrete or rigid frame firmly and horizontally
by bolt nut. (ø10 mm).
2. When installing at roof, please consider strong wind and
earthquake. Please fasten the installation stand firmly with
bolt or nails.
• Align the center of piping and sufficiently tighten the flare
nut with fingers.
• Further tighten the flare nut with torque wrench in specified
torque as stated in the table.
MODEL
C7CK, C9CK, A7CK,
A9CK, V7CK, V9CK,
3/8" (42 N.m)
W7CK, W9CK
C12CK, A12CK,
1/2" (55 N.m)
V12CK, W12CK
Piping size (Torque)
Gas
Liquid
1/4" (18 N.m)
1/4" (18 N.m)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents