Test Run - Nespresso EF 451 C 111 Service Manual

Citiz citiz & milk citiz refresh coffee machines
Table of Contents

Advertisement

For better visibility
use a flashlight.
106
F U N C T I O N T E S T S
9) Connect mains cable.
10) Start coffee machine.

9.4.2 Test run

11) After heating up, press the espresso
button.
12) Open the valve and let the water flow
for approximately 10 sec out of the
drain hose.
13) Close the valve completely. The pres-
sure stabilizes after increasing briefly
between 16-19 bar (pressure check).
The pressure increases slowly with
increasing temperature. Should the
pressure exceed 23 bar, switch off
the coffee machine and release the
pressure by opening the valve.
14) Check all connections under pressure
for audible and visible leaks.
Do not run the pump for more
than 50 sec with the valve closed.
Citiz service manual
9.
10 sec
12. / 13.
max. 50 sec
10.
11.
14.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ef 452 d 111Ef 467 c 121Ef 468 d 121

Table of Contents