Assembly checkpoints
71
•
All covers are assembled on the core unit.
•
Check that wiring between core unit and platform is led through cable fixation (71).
•
Use marked cable guides to lay wires.
•
Check wiring of milk frother connector (61), see detail.
•
During assembly of the water tank connector (53) on the platform, each of its 3
latches has to engage with an audible click.
Earth
Neutral
Line
53
Citiz service manual
R E P A I R S
61
69