Tube Assembly - Brant Radiant Heaters LD Series Operation, Installation, Maintenance And Parts Manual

Commercial, industrial, residential tube heater
Table of Contents

Advertisement

2
INSTALLATION
2
.4

Tube Assembly

All LD models use highly emissive coated aluminized
titanium steel for combustion tube ( first 10 ft./3.1m).
An aluminized titanium tube is identified by a bright
yellow shipping band. The exchanger tubes are highly
emissive coated aluminized steel.
1. Slide tubes through hangers with welded seam
downwards and locate tube clamp on tube.
2. Mate tubes completely then recheck suspension
hanger locations and secure. Center clamp on
seam and torque clamp bolts to 50 - 60 lbs. - ft.
Figure 2.4.1
Figure 2.4.1
3. STOP: Before final assembly of the last radiant
tube verify baffle length, install baffle in the
vertical position and complete final assembly.
See figure 2.4.2 on page 11.
4. Optional: Exchanger configuration 45, 90, 180
degree. Refer to page 14 and 15.
10

Advertisement

Table of Contents
loading

Table of Contents