1. Cable conduit
3. Grasp the cable conduit and move it toward the front
of the machine until the discharge chute latch fully
engages the gear teeth (Figure 59 and Figure 60).
1. Discharge chute latch
Note: The latch is spring loaded and will naturally
move into the teeth of the gear (Figure 60).
4. Remove any slack in the cable by pulling the cable
conduit rearward.
5. Tighten the bolt on the cable clamp, being careful not
to strip the plastic part.
6. Install and secure the gear cover.
Replacing the Drive Belts
If the auger/impeller drive belt or the traction drive belt
becomes worn, oil-soaked, or otherwise damaged, have an
Authorized Service Dealer replace the belt.
Replacing the Headlight Bulb
Use a GE 899 37W halogen light bulb. Do not touch the
bulb with your hands or allow dirt or moisture to come into
contact with the bulb.
1. Remove the wire connector from the back of the
headlight (Figure 61).
Figure 59
2. Cable clamp
Figure 60
2. Gear teeth
2. Turn the base of the bulb counterclockwise until it
stops (Figure 62).
3. Remove the bulb straight out from the back of the
headlight (Figure 63).
4. Insert a new bulb into the back of the headlight (Figure
64).
5. Turn the base of the bulb clockwise until it is snug
(Figure 65).
26
Figure 61
Figure 62
Figure 63
Figure 64