Yamaha Z300A Supplementary Service Manual page 48

Table of Contents

Advertisement

POWR
3. Install the hose joint assembly 6 and the
apron 7.
4. Connect the PTT switch coupler and the
shift lever 8.
5. Connect the cooling water hose 9.
9
6. Connect the cooling water hose 0 to the
Rectifier Regulator.
7. Connect the PTT motor leads A, and
then tighten the PTT motor lead bolts to
the specified torque.
41
Power unit
S6D05110
PTT motor lead bolt:
4 N·m (0.4 kgf·m, 3.0 ft·lb)
8. Install the bracket B and connect the
trim sensor coupler (or connector) C.
B
9. Install the junction box cover.
10. Connect the fuel hose D and oil hose E.
C
S6D05130
6D03F1X

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lz300a

Table of Contents