JEM Glaciator X-Stream User Manual
Hide thumbs Also See for Glaciator X-Stream:

Advertisement

USER GUIDE
VERSION 1.0
Heavy Fog
Glaciator
X-Stream
Martin Professional A/S,Olof Palmes Allé 18, DK-8200,Aarhus N
Phone: +45 87 40 00 00 Internet: www.martin.dk

Advertisement

Table of Contents
loading

Summary of Contents for JEM Glaciator X-Stream

  • Page 1 USER GUIDE VERSION 1.0 Heavy Fog Glaciator X-Stream Martin Professional A/S,Olof Palmes Allé 18, DK-8200,Aarhus N Phone: +45 87 40 00 00 Internet: www.martin.dk...
  • Page 2 Inspect and clean/replace every NOTE! The warranty on this machine is conditional on the use of 250 hours genuine JEM / Martin fluid only. Other fluids may represent a health Severe Conditions hazard when used in this machine, and may damage the internal Inspect and clean/replace every components.
  • Page 3: Table Of Contents

    Local Remote Fluid System Valid start codes = 0 (dimmer data only) Full framing error detection implemented Refrigeration System Control Analogue control via standard JEM Multifunction Contoller. Evaporator Fan Control PLC interface for simple switching control of the system. CONTROL PANEL...
  • Page 4: Heat Exchanger

    BASIC FAULT FINDING The Heavy Fog Glaciator is a complex machine and will require a competent The Heavy Fog Glaciator X-Stream is the latest product in the new service technician to repair any major faults. However, the following guide generation range of JEM professional machines. Designed for touring and will allow the user to overcome the more common problems.
  • Page 5: Safety Guidelines

    Do not remove the covers or attempt to repair a faulty machine, an autho- Displayed when the heater is running but the machine is not Fog/Ht rized JEM dealer should be contacted in the event of a faulty machine. ready. Always use smoke machines in well ventilated areas, over-use could affect...
  • Page 6: Machine Layout

    GUIDE GUIDE MACHINE LAYOUT INTERFACE OPTIONS FOR GLACIATOR X-STREAM The PLC interface connector is now fully operational on all models, without the need to fit an extra interface PCB to the machine. This allows installers to control the functions of the machine using active low signals from a PLC or other automatic control system.
  • Page 7: Commissioning The Machine

    Unpack the machine and look for any obvious signs of damage. machine. It is assumed that the machine is being started from cold. Place the machine on a level surface and fit a container of JEM/Martin Starting with all the control panel switches OFF, and the display showing approved fluid into the fluid compartment.
  • Page 8: Dmx Operation

    HEAVY FOG GLACIATOR HEAVY FOG GLACIATOR USER USER GUIDE GUIDE DMX OPERATION ICE: Setting this switch to ON, will start the compressor. There will always be The machine may be operated using the industry standard DMX 512 digital a delay of up to 20 seconds to allow pressure equalisation. control protocol.
  • Page 9 HEAVY FOG GLACIATOR HEAVY FOG GLACIATOR USER USER GUIDE GUIDE CONTROL PANEL FUNTIONS The machine uses a ‘pump ramping’ technique to allow continuous The control panel provides a means to enable the various functions that operation. This means that transmitting DMX 100% will cause the machine to control the Fog and Ice operation.
  • Page 10: The Display

    HEAVY FOG GLACIATOR HEAVY FOG GLACIATOR USER USER GUIDE GUIDE EVAPORATOR FAN CONTROL THE DISPLAY Two LED displays are used in the Heavy Fog Glaciator to show status and When the current firing cycle is over, the evaporator fan will run at maximum control information.
  • Page 11 HEAVY FOG GLACIATOR HEAVY FOG GLACIATOR USER USER GUIDE GUIDE REFRIGERATION SYSTEM CONTROL To store the new value into non-volatile memory, the enter key must be The performance of the refrigeration system in the Heavy Fog Glaciator is pressed before moving on to another menu or leaving the edit mode. the key to its heavy fog generating capability.
  • Page 12: The Fluid System

    HEAVY FOG GLACIATOR HEAVY FOG GLACIATOR USER USER GUIDE GUIDE THE FLUID SYSTEM LOCAL/REMOTE FLUID SYSTEM The Heavy Fog Glaciator uses a 5L (1.3 US Gal.) container to give The Local / Remote fluid system used on the Glaciator gives users the approximately 1.5 hours of continuous operation at full output.