Indoor Unit Installation - Trane MCC 518 ZB Installation Manual

Cassette split system, 18,000 - 48,000 btu/h under ceiling type mcc series 50 hz
Hide thumbs Also See for MCC 518 ZB:
Table of Contents

Advertisement

Where to install Indoor Unit
• There should not be any heat
source or steam near the unit.
• There should not be any obstacles
to prevent the air circulation.
• A place where air circulation in the
room will be good.
• A place where drainage can be
easily obtained.
• A place where noise prevention is
taken into consideration.
• Do not install the unit near the
door way.

Indoor Unit Installation

• Select the location where a space
is more than 100 cm. as shown in
figure 1 also ensure that the
position dose not interfere with
light fitting, sprinkle head, etc.
• Determine the ceiling hole by using
the paper pattern.
Figure 1
- Determine the mounting position
Figure 2
4
Indoor Unit Installation
• Hang the four mounting rods to the
positions marked as picture shown
in figure 3 (using twelve nuts and
eight washers to support the
suspension brackets). Suspend
the unit to the mounting rods.
Lock the nuts, ensure for good
drainage, and check whether the
unit is on horizontal level by using
leveling guage.
Suspension
more than
100 cm.
Lock Nut
Washers
Bracket
Figure 3
• Install the leveling metal plate to
adjust the gap between the unit
and a ceiling, fixing the screws
paper pattern.
Cross Section
of Air Outlet
Figure 4
• Remove four screws (M8). Fix the
front panel with the units by tighten
up four screws (M8).
Figure 5
Caution: Over tightening the screws
will distort the front panel.
MCC-SVN02A-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents