Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
For further information regarding the individual steps, see the page indicated
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
118
Commissioning steps
Inspection steps
Maintenance steps
1. Opening the heat pump.................................................. 119
2. Writing reports................................................................ 119
3. Checking the refrigeration circuit for leaks................. 119
4. Filling and venting on the primary side........................ 120
5. Filling and venting on the secondary side................... 120
6. Filling and venting the solar circuit.............................. 121
7. Checking expansion vessels and the primary circuit/
heating circuit pressure................................................. 121
8. Commissioning assistant.............................................. 121
9. Integrating a heat pump control unit into a LON......... 124
10. Closing the heat pump
11. Instructing the system user........................................... 125
Page