Download Print this page

Electrical Requirements; Plumbing Requirements; Plumbing Hook-Up - Bunn DUAL SH DBC Operating Manual

With smart funnel
Hide thumbs Also See for DUAL SH DBC:

Advertisement

ELECTRICAL REQUIREMENTS

WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
L2 RED
L2 RED
L2
L1 BLACK
L1 BLACK
L1
GREEN
GREEN
G
200 and 230 volt ac models
Note: This electrical service consists of 2
current carrying conductors (L1 and L2)
and a separate conductor for earth ground.
ELECTRICAL HOOK-UP (Models without power cord)
CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect
electrical connections is not covered by warranty.
1. An electrician must provide electrical service as specified in conformance with all local, state and federal
electrical codes.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove the front panel beneath the sprayheads to gain access to the terminal block.
4. Feed the cord through the strain relief and connect it to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-
place the front panel.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for Initial Set-Up.
ELECTRICAL HOOK-UP (Models with power cord)
WARNING – If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service
personel with a special cord available from the manufacturer or its authorized service personel in order to
avoid a hazard. Improper electrical installation will damage electronic components. Damage caused by
incorrect electrical connections is not covered by warranty.
1. An electrician must provide electrical service as specified in conformance with all local, state and federal
electrical codes.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
NOTE - If the brewer was shipped without a plug on the power cord a qualified service personnel must
select and install the proper UL listed grounding type attachment plug specified on the rear of the brewer.
3. Remove the front panel beneath the sprayheads to gain access to the terminal block.
4. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
5. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumb-
ing has been hooked up, the brewer is ready for Initial Set-Up.
WARNING – Electrical connections must be made as specified above. Failure to follow these instructions can
result in personal injury, property or equipment damage.
L2 RED
L2 RED
L2
WHITE
WHITE
N
NEUTRAL
NEUTRAL
L1 BLACK
L1 BLACK
L1
GREEN
GREEN
G
120/208 and 120/240 volt ac models
Note: This electrical service consists of 3 cur-
rent carrying conductors (Neutral, L1 and L2)
and a separate conductor for earth ground.
Page 4
CE REQUIREMENTS
• This appliance must be installed in locations where it can be overseen by trained personnel.
• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C.
• Appliance shall not be tilted more than 10° for safe operation.
• An electrician must provide electrical service as specified in conformance with all local and national codes.
• This appliance must not be cleaned by water jet.
• This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental
capabilities, or lack of experience and knowledge, unless they have been given instructions concerning use of
this appliance by a person responsible for its safety.
• Children should be supervised to ensure they do not play with the appliance.
• If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel with
a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard.

PLUMBING REQUIREMENTS

This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138
and 620 kPa) from a
Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The
water inlet fitting is
NOTE – Bunn-O-Matic recommends
feet from the
" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer
1
2
to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water flow.
As directed in the International Plumbing Code of the International Code Council and the Food Code
Manual of the Food and Drug Administration (FDA), this equipment must be installed with adequate
backflow prevention to comply with federal, state and local codes. For models installed outside the
U.S.A., you must comply with the applicable Plumbing /Sanitation Code for your area.

PLUMBING HOOK-UP

NOTE - If a backflow preventer is required by code, a shock arrestor should be installed between backflow preventer
and dispenser. Installing the shock arrestor as close to dispenser as possible will provide best results.
1. Flush the water line and securely attach it to the fitting located on bottom of brewer.
2. Turn on the water supply.
29877.4 031312
" or larger supply line. A shut-off valve should be installed in the line before the brewer.
1
2
" flare or female quick connect.
1
4
" copper tubing for installations of less than 25 feet and
1
4
Page 5
" for more than 25
3
8
29877.4 031312

Advertisement

loading