AC Circuit Breakers:

The main service panel must dedicate a 15 amp minimum, double pole breaker (120/240 volts
AC) to operate the ST unit.

Wire Routing:

Determine all wire routes both to and from the Sun Tie. Possible routing considerations include:
AC input wiring from the main service panel to the ST
DC input wiring from the PV array to the ST
DC ground from the PV array to an external ground rod
All wiring and installation methods should conform to applicable electrical and building codes.
Pre-plan the wire and conduit runs. The DC terminal blocks accept up to a #6 AWG wire; the
AC circuit disconnects accept cable sizes up to #1 AWG.
For maximum safety, run both AC and DC wires/cables in (separate) conduits.
WARNING: CHECK FOR EXISTING ELECTRICAL OR PLUMBING PRIOR TO DRILLING HOLES
IN THE WALLS!