Max-Ox MX-900B Operator's Manual page 54

Commercial wood chip-fired hydronic boiler
Table of Contents

Advertisement

Note: The control panel electrical disconnect switch is equipped with
a hinged red plastic "Lock-out" lock tab. To deploy the lock tab, use a
small straight-blade screwdriver to gently pry open the hinged red
lock tab.
8. By hand, remove all fuel from the Metering Bin. Then visually inspect
for the Feed Auger obstruction and dislodge / remove it, if the
obstruction is within reach.
Note: It is easier to clean out the Metering Bin of the Air Gate
assembly is removed from the Metering Bin.
9. If the obstruction is not within reach through the Metering Bin
opening, then the auger gear reducer / motor assembly, and helical
auger shaft must be removed from the Metering Bin in order to clear
the obstruction.
10. During re-assembly, take care to ensure that Feed Auger alignment is
proper such that the auger does not rub anywhere along its length. If
the auger rubs, reposition the gear reducer mounting plate vertically or
horizontally, within the travel limits of the over-sized bolt holes, to
create auger clearance. Torque mounting bolts properly.
Do not attempt to clear the jam by repeated operation of the Feed Auger in
the manual reverse jog mode because fuel in the Metering Bin will pack
tight into the back of the Metering Bin and result in bending of the helical
auger flight adjacent to the gear reducer.
Max-Ox™ MX-900B Operators Manual, Rev. 0
Page 54 of 54

Advertisement

Table of Contents
loading

Table of Contents