Boiler Water Treatment Program - Max-Ox MX-900B Operator's Manual

Commercial wood chip-fired hydronic boiler
Table of Contents

Advertisement

Boiler Water Treatment Program:

Follow a bi-annual (every 6 months) commercial boiler water chemistry
program for boiler water chemical analysis, chemical treatment, boiler
water total-dissolved solids blow-down, and boiler make-up water
addition for an open-system (non-pressurized) hydronic heating boiler.
Failure to follow a commercial water treatment program for corrosion
control of your boiler will void the Limited Warranty on your boiler
vessel whetted components.
Feed Auger Jam Clearing Procedure
In the event a Feed Auger jam occurs that does not clear itself under the
automatic control of the PLC, the Feed Auger motor will stop and a
"Rotation Fault" alarm will occur. Proceed as follows:
1. On the Alarm screen, acknowledge the alarm.
2. On the Feed Auger screen, re-start the Feed Auger motor by pressing
the "Start" icon.
Note: the Feed Auger motor will jog momentarily in the reverse
direction, and then proceed to run in the forward direction.
3. If the "Rotation Fault" alarm does not recur, proceed with normal
operation of the MX-900B.
4. If the "Rotation Fault" recurs, the MX-900B must be shut down, and
the Feed Auger train cleaned as follows:
5. Perform a normal shut-down of the MX-900B.
6. Switch "Off" the electrical disconnect on the electrical controls panel.
7. Perform a "Lock-out / Tag-out" procedure on the MX-900B electrical
disconnect switch. to ensure no MX-900B motors can start.
Max-Ox™ MX-900B Operators Manual, Rev. 0
Page 53 of 54

Advertisement

Table of Contents
loading

Table of Contents