Testing New Batteries - Powerware 5115 User Manual

Tower ups 500–1400 va
Hide thumbs Also See for 5115:
Table of Contents

Advertisement

Testing New Batteries

Press and hold the
The 15-second test automatically distributes the load to the batteries and
tests the battery's performance. While the test is in progress, the
indicators cycle through and the alarm sounds. When complete, the UPS
returns to Normal mode as indicated by the
If there is a problem with the battery, the alarm beeps, the
illuminates and the
and be sure the battery is fully charged. Call your service representative
if the problem persists.
Powerware
5115 Tower UPS (500–1400 VA) User's Guide
®
6.
Replace the battery. See "Recycling the Used Battery" on
page 34 for proper disposal.
7.
Connect the black battery cable to the new battery and then
connect the red battery cable.
8.
Reinstall the battery.
9.
Reinstall the metal battery cover and front panel.
NOTE
Allow batteries to charge for 6 to 24 hours before testing.
button for three seconds to initiate a self-test.
indicator flashes. Check the battery connections
05146640 Rev C www.powerware.com
S
UPS Maintenance
µ
indicator.
indicator
+ ---
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents