Testing New Batteries - Powerware 5105 User Manual

450-1500 va
Hide thumbs Also See for 5105:
Table of Contents

Advertisement

UPS Maintenance

Testing New Batteries

NOTE It is recommended that the batteries charge for 24 hours before testing.
Press and hold the
After the test is finished, the red Battery Service indicator should turn off
and the Battery Charge LEDs should show a charge. If the Battery
Service indicator stays on, check the battery connections. Call your
service representative if the problem persists.
Recycling the Used Battery
Contact your local recycling or hazardous waste center for information
on proper disposal of the used battery.
S
Do not dispose of the battery or batteries in a fire. Batteries may explode. Proper
disposal of batteries is required. Refer to your local codes for disposal
requirements.
S
Do not open or mutilate the battery or batteries. Released electrolyte is harmful to
the skin and eyes. It may be toxic.
Do not discard the UPS or the UPS batteries in the trash. This product contains sealed,
lead-acid batteries and must be disposed of properly. For more information, contact
your local recycling or hazardous waste center.
22
button for three seconds to initiate a self-test.
W A R N I N G
C A U T I O N
Powerware
5105 User's Guide
®
S
05146193 A Uncontrolled Copy

Advertisement

Table of Contents
loading

Table of Contents