Starting The Appliance - Worcester 29CDi GC 47-406-34 Installation, Commissioning And Servicing Instructions

Wall hung rsf gas fired condensing combination boiler
Table of Contents

Advertisement

9. Refill the system up to 1 bar. Turn the white control tap (C) to its
closed position and then remove the charging key by turning back to
its "unlock" position and withdrawing.
10. Place the charging key (D) in its storage position (E) on the bottom
cover of the boiler.
C
D
Fig. 36 Filling link key
GAS SUPPLY
B Open gas cock on the boiler and purge the gas supply to the boiler
ensuring that the room is well ventilated.
B Test gas supply for tightness as described in
BS 6891.
5.3

STARTING THE APPLIANCE

NOTICE: Never run the appliance when the appliance/
system is empty or partially filled.
SWITCHING THE APPLIANCE ON/OFF:
1. Turn on mains power supply.
B Turn on any external controls.
B Set the thermostatic radiator controls to maximum temperature.
B Set the clock/programmer to continuously ON and the room
thermostat to maximum temperature.
– A - On/off button
– B - Cover or position for optional plug-in control
– C - Display
– D - System pressure gauge
– E - Reset button
– F - ECO button
– G - Holiday button
– H - DHW temperature control
– I - Central heating temperature control
– J - Performance test button
– K - Service button
– L - Burner indicator (GREEN)
– M - On/off and fault indicator (BLUE)
– N - Automatic air vent
6 720 803 599 (2012/06)
A
L
K
J
I
Fig. 37 Control panel
B Press button (A) and the power on indicator (M) illuminates BLUE.
After a few seconds the display (C) will show the flow temperature.
2. Turn the CH temperature control (I) to maximum. The burner on
E
indicator (L) illuminates GREEN when the burner has lit.
6720647361-21.2Wo
3. If the boiler fails to light the BLUE power indicator (M) and reset
button (E) will flash alternately.
To reset press and hold the reset button (E) for two seconds. The
boiler will be reset.
Fig. 38 Auto Air Vent
B
3
4
5
2
2
1
6
1
max
min
M
B The first time the appliance is switched on, a once-
only venting function is activated. The heating pump
then switches on and off at intervals. This sequence
lasts about 8 minutes. The display shows
alternation with the CH flow temperature.
Ensure that the automatic air vent (N) is open.
B The boiler then runs for 15 minutes at minimum
heating output to fill the condensate trap, the display
(C) alternates between "-II-"and the central heating
flow temperature. This occurs every time the mains
supply has been interrupted.
CAUTION: DO NOT PRESS THE POWER INDICATOR
(M) TO RESET THE BOILER.
N
6720647361-22.1Wo
COMMISSIONING
C
2
1
1
3
0
4
bar
D
reset
eco
E
F
3
4
e
G
6
max
H
6720647361-23.2Wo
in
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents