Exmark Ultra VAC QDS LAZER Z Operator's Manual page 19

For lazer z, lazer z xp and lazer z xs models
Hide thumbs Also See for Ultra VAC QDS LAZER Z:
Table of Contents

Advertisement

3.5.4 Drill 3/8" holes at the points marked.
3.5.5 For Lazer Z units without a ROPS: Open the floor pan and install four weight
plates (Item 35) behind the front panel and one weight plate (Item 35) in front of
the panel using the 5/16-18 x 1.75 screws, 5/16 washers and5/16-18 whizlock
nuts (Items 36, 37, and 38). The weight plates will only fit with the ears located
near the bend in the floor pan (See Figure 9). Apply the decal included in the
literature pack to the center of the weight plate that was mounted to the top of the
floor pan.
3.5.6 For Lazer Z units prior to SN 440,000 with a ROPS: Open the floor pan and install (4)
weight plates behind the front panel, (1) weight plate in front of the front panel, and
(2) weight mounting plates (Items 35, and 41) as shown in Figure 12 using (4) 5/16-
18 x 2.0 screws, (4) 5/16 flat washers, and (4) 5/16-18 whizlock nuts (Items, 36, 37,
and 38).
3.5.7 Hook weight plate assembly (Item 40) over the top of the weight mounting plates and
secure with two hairpins (Item 42) as shown in Figure 10.
Note: The removable weight is heavy. Use care when lifting. Make sure
that you can hold the weight securely before lifting. Use caution when
positioning your hands so that you do not set the weight down on your
hands or fingers.
FIGURE 8
FIGURE 9
14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents