Closing The Sunny Boy - SMA SUNNY BOY 1100 Installation Manual

Pv inverters
Hide thumbs Also See for SUNNY BOY 1100:
Table of Contents

Advertisement

SMA Solar Technology AG
DANGER!
Danger to life due to high voltages in the Sunny Boy!
The capacitors in the Sunny Boy require 15 minutes to discharge.
• Wait 15 minutes before opening the Sunny Boy.
4. Remove all screws from the enclosure lid and pull
the lid forward smoothly.
5. Remove the PE connection from the lid by loosening
the locking device of the PE connection on the lid.
☑ The Sunny Boy is free of voltage and you can work
on it.
7.2 Closing the Sunny Boy
1. Connect the protective earth (PE) to the enclosure lid.
2. Secure the enclosure lid of the Sunny Boy by evenly
tightening the 4 lid screws.
3. Check the DC plug connector for correct polarity
and connect it.
Installation Guide
Opening and Closing
SB11_12_17-IEN094131
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunny boy 1700

Table of Contents