8.
8.2
1
Click the base onto the
service rail (not included) or
attach them with screws and
plugs on the wall.
5
Place the pump/ boiler cable
in the chassis
24
REHAU STAR CONTROLS INSTALLATION
STAR CENTRE AND STAR PUMP RELAY CONNECTION
AND MOUNTING
2
Cut the cables of the
actuators, the controllers and
the mains cable to the length
mentioned above.
6
After you have fi nished
the cable-work, place the fi bre
protector inside the chassis
3
Place the power cable in the
chassis
7
Please put the REHAU STAR
Centre Plus inside the chassis
and secure it with 6 screws as
shown above
4
Place the controller cables
(upto 6) in the chassis
8
Bend the cables 180
degrees, then slide them into
place in the terminal, using
the tool supplied. No screwing
needed! Ensure all cables are
connected properly.