Chapter 2
Switch Installation
Figure 2-25
1
Insert the other cable end in an RJ-45 connector on a target device.
Step 2
Observe the port status LED.
Step 3
The LED turns green when the switch and the target device have an established
link.
The LED turns amber while the STP discovers the network topology and searches
for loops. This process takes about 30 seconds, and then the port LED turns green.
If the LED is off, the target device might not be turned on, there might be a cable
problem, or there might be problem with the adapter installed in the target device.
See
If necessary, reconfigure and restart the switch or target device.
Step 4
OL-6422-01
Connecting to a 1000BASE-T SFP Module
24
23
24
25
26
27
1 1
RJ-45 connector
Chapter 3, "Troubleshooting,"
C a ta ly s t 2
9 7 0
S E R IE S
28
for solutions to cabling problems.
Catalyst 2970 Switch Hardware Installation Guide
Connecting to SFP Modules
2-33