CONTENTS TECHNICAL SPECIFICATION OF PRODUCT ....................4 FUNCTION DESCRIPTION ........................4 DESIGN AND GENERAL HEATER DIMENSIONS .................. 4 1.2.1 PRODUCT DESCRIPTION ......................4 1.2.2 TECHNICAL DATA ........................5 OPERATION AND FITTING INSTRUCTIONS ....................12 PUTTING THE HEATER INTO OPERATION ..................12 CONNECTING A HEATER TO A HOT WATER DISTRIBUTION ............
Page 3
READ CAREFULLY THE BELOW INSTRUCTIONS PRIOR TO THE INSTALLATION THE HEATER! Dear Customer, The Works Cooperative of Dražice – Machine Plant, Ltd., would like to thank you for your decision to use a product of our brand. With this guide, we will introduce you to the use, construction, maintenance and other information on electrical water heaters.
1 TECHNICAL SPECIFICATION OF PRODUCT 1.1 FUNCTION DESCRIPTION Indirect stationary heater OKC 250 (300, 400, 500, 750, 1000) NTR / HP is designed for water heating in conjunction with a heat pump. Reheat can be carried out by the electric heater TJ 6 / 4“. 1.2 DESIGN AND GENERAL HEATER DIMENSIONS 1.2.1 PRODUCT DESCRIPTION The heater vessel is welded from a steel plate and as a whole is protected by enamel resistant to hot water.
1.2.2 TECHNICAL DATA OKC 250 OKC 300 OKC 400 OKC 500 OKC 750 OKC 1000 NTR/HP NTR/HP NTR/HP NTR/HP NTR/HP NTR/HP Capacity Height 1541 1580 1591 1921 2050 2083 Diameter 1090 Maximum weight without water Maximum operating pressure in the tank Maximum operating overpressure in the exchanger...
2 OPERATION AND FITTING INSTRUCTIONS 2.1 PUTTING THE HEATER INTO OPERATION After connecting the heater to the water distribution system, hot water heating system, respectively electrical power system and after checking the safety valve (following the instructions attached to the valve) the heater can be put into operation.
The heater’s cold water inlet must be fitted with a T-fitting with a discharge valve for any discharge of water from the heater Each individually lockable heater must also be equipped at the hot water inlet with a test cock, check valve, safety valve and level gauge. 2.3 PLUMBING FIXTURE Power water connects to pipes with 3/4”...
Required pressures – Table 33. We recommend that the hot water distribution from the heater was as short as possible to minimise heat losses. Heaters must be provided with a discharge valve ADMISSIBLE SAFETY VALVE OPERATING MAXIMUM mounted on the cold service water inlet to the STARTING OVER- PRESSURE IN...
2.5 HEATER CLEANING AND ANODE ROD EXCHANGE Repetitive water heating causes limestone sediment on both the enamelled tank walls and chiefly the flange lid. The sedimentation depends on the hardness of water heated, its temperature, and amount of hot water consumed. We recommend checking and cleaning the tank from scale and eventual replacement of the anode rod after two years of operation.
3.2 INSTALLATION REGULATIONS Both the electric and water installation must follow and meet the requirements and regulations relevant in the country of use! 3.3 DISPOSAL OF PACKAGING MATERIAL AND FUNCTIONLESS PRODUCT A service fee for providing return and recovery of packaging material has been paid for the packaging in which the water heater was delivered.
Need help?
Do you have a question about the OKC 250 NTR/HP and is the answer not in the manual?
Questions and answers