Emerson XC1008D Installing And Operating Instructions page 38

Table of Contents

Advertisement

FAN2 = output for inverter fans – circuit 2 (only some fans driven by inverter, others enabled by
on/off);
INVF1 = not used
INVF2 = not used
nu = not used
2Q2
Reference probe for analogue output 2, it's used only when 2Q1 = FREE
Pbc1= Suction Probe, circuit 1 (term. 62-63 or 62 -68)
Pbc2 = Suction Probe, circuit 2 (term. 64-63 or 64 -68)
2Q3
Adjustment of read out for the analog output 2 at 4mA/0V (-1.00÷100.00 bar; -15÷750PSI; -
50÷150°C; -58÷302°F; -100÷10000 KPA). It's used only when 2Q1 = FREE
2Q4
Adjustment of read out for the analog output 2 at 20mA/10V (-1.00÷100.00 bar; -15÷750PSI; -
50÷150°C; -58÷302°F; -100÷10000 KPA). It's used only when 2Q1 = FREE
2Q5
Minimum value for analogue output 2 (0 ÷ 100%)
2Q6
Analog output 2 value after compressor start (2Q5 ÷ 100 %) It's the value of the analogue output
after a compressor has started, when the pressure/temperature is above the regulation band. – Used
during inverter regulation
2Q7
Analog output 2 value after compressor is switched off (2Q5 ÷ 100 %) It's the value of the
analogue output when a compressor has been switched off and the the pressure/temperature is
below the regulation band. – Used during inverter regulation
2Q8
Exclusion band start value for analog output 2 (2Q5 ÷ 100 %): it allows to exclude a range of
frequencies that could create problems to the compressor. – Used during inverter regulation
2Q9
Exclusion band end value for analog output 2 (2Q8 ÷ 100 %)– Used during inverter regulation
2Q10
Safety value for analog output 2
2Q11
Delay between the entrance in the regulation band and the regulation activation (0 ÷ 255sec):
it's the delay between the entrance in the regulation band of pressure/temperature and the regulation
start. Used to avoid false inverter starts dued to pressure variations. – Used during inverter
regulation.
2Q12
Analog output 2 rise time (0 ÷ 255 sec) It's the time necessary to the analog output to pass from
the 1Q6 to 100%, when a compressor has started and the pressure/temperature is above the
regulation band. – Used during inverter regulation.
2Q13
Analog output 2 permanency before load activation (0 ÷ 255 sec): the analog output remains at
100% value for this time before a load is activated. - Used during inverter regulation
2Q14
Delay between pressure (temperature) goes down the set point and start of analog output 2
decreasing (0÷255sec). – Used during inverter regulation
2Q15
Analog output decreasing time (0 ÷ 255sec) It's the time taken from the analog output to pass from
the 100% to the 2Q5 value. It's used during the switching off phase, when the pressure is below the
set point.
2Q16
Analog output 2 permanency at 2Q5 value before a load is switched off (0 ÷ 255sec) When the
pressure (temperature) is below the set point, the analog output 2 remains at 2Q5 value before a
load is switched off.
2Q17
Analog output 2 decreasing time when a load is switched on (0 ÷ 255sec) It's the time necessary
to the analog output to pass from 100% to 2Q6 when a load is switched on.
2Q18
Regulation band (0.10÷25.00bar; 0.0÷25.0°C; 1÷250 PSI; 1÷250°F;10÷2500 KPA). It is the band
with the proportional action. It replaces CP1 for the inverter regulation. It is add to the set point. The
proportional action starts when the temperature/pressure value is higher than the set point and it
reaches the 100% when the pressure/temperature is equal or higher than set + 2Q18.
2Q19
Integral time (0÷999s; with 0 integral action excluded). It sets the pound of the proportional action.
The higher is 1Q20, the lower is the integral action support.
2Q20
Band offset (-12.0÷12.0°C -12.00 ÷ 12.00BAR, -120÷120°F, -120÷120PSI; -1200÷1200KPA). Used
to move the regulation band across to the set point.
2Q21
Integral action limitation (0.0÷99.0 °C; 0÷180°F; 0.00÷50,00bar; 0÷725PSI; 0÷5000kPA) to stop the
increasing of integral action when the pressure reaches the SET + 1Q22 value.
2Q23
Minimum inverter capacity with poor lubrication (0÷99%; with 0 function excluded) If the
frequency compressor works for the 1Q25 time with a frequency (in percentage) equal or lower than
2Q23, it is forsed to work at 100% for the 2Q25 time in order to make the right lubrication.
2Q24
Maximum inverter functioning time at a lower frequency than 2Q24, before working at 100%
(1÷255min)
2Q25
Time of Inverter al 100% to restore the right lubrication (1÷255min)
1592021021 XC1008-1011-1015D GB A5 r.1.5A 12.10.2009
(0 ÷ 100 %): it's used in case of probe faulty.
XC1008-1011-1015D
38/66

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xc1011dXc1015dVgc810

Table of Contents